Welcome to Haixing Industrial Group Co., Ltd. 

Mob/WhatsApp:+86 15522419684       E-mail: info@hx-machinery.com

PRODUCT

CONTACT US

If you are interested in cooperation, please contact us immediately, we will give you feedback as soon as possible!




  • stud and track rolling machine (7).jpg
  • stud and track rolling machine (8).jpg

stud and track rolling machine

Develivery time: 45-50 days After get 30% deposit Payment:30% T/T deposit,70% balance before shipping Voltage:380V 50HZ 3Phase or based on customer’s need . Warranty :2 years for machinery warranty

SEO :

stud and track rolling machine

hiddenValue

PRODUCT DETAILS

stud and track rolling machine

The stud and track rolling machine is a specialized equipment designed for the efficient production of stud and track rolling machine, which are widely used in construction for framing, partitioning, and ceiling systems. stud and track rolling machine features a fully automated roll forming process that transforms steel coils into precise C-shaped profiles with consistent dimensions and high structural integrity. Equipped with advanced servo systems, precision rollers, and a PLC control panel, the machine ensures smooth operation, accurate forming, and easy adjustment of parameters. 

stud and track rolling machine
Formed Material GI/GL, PPGI/PPGL Thickness: 0.18-0.5mm
Decoiler Hydraulic  decoiler Manual decoiler(will give you as free)
Main body Roller station 16 rows (As your requirement)
Diameter of shaft 70mm solid shaft
Material of rollers 45# steel, forging with chromium plate 0.05mm,
Machine body frame 350 H Beams
Dimension(L*W*H) 8.5*1.2*1.3m (customize)
Weight About 3000kgs
Cutter Automatic Cr12 Mov quenched treatment 58-62
Cutting tolerance ±1mm
Power Motor Power 5.5Kw
Hydraulic system power 11Kw
Reducer 8# gear reducer
Voltage 380V 50Hz 3Phase As your requirement
chain 2 inch  As your requirement
Control system Electric Box Delta (As your requirement)
Language English, Spanish, etc.(Support multiple languages)
PLC Automatic production of the whole machine. Can set batch, length, quantity, etc.
Forming Speed 20-25m/min The speed depends on the shape of the tile and the thickness of the material.

stud and track rolling machine Afer-Sale Service

1.Payment: 30%T/T in advance and 70%balance after testing and before shipment.
2.Delivery: 45-50 working days after the deposit.
3.Validity time: 30 working days
4.After-sales service
A: Warranty: One year ,and we will provide the technical support for the whole life.some spare parts are available.
B: Training and service: the buyer should charge of visa, round-trip ticket, food and accommodation overseas and USD 120/person/day for salary.
C.The advantage of my factory: we have a team of skilled engineers and one group for after-sale service.
D: we will provide you the manual for installation, operation and maintenance in English.

stud and track rolling machine Packing&Shipping 

– 1.Nude,with waterproof cloth and stow-wood. Imported computer control system packed with waterproof cloth and card board.

– 2.This producing line is main stud and track rolling machine free of charge for 24 months.When the machine is used in China, we will install and debug the stud and track rolling machine for free; if it is used at abroad,we will send the professional technician to debug. Buyers should take all the fees for technicians travelling abroad.

– 3.All the parts in the stud and track rolling machine is free to maintain all the life,if in 24 months our company bear the cost for exchanged the broken part like the new parts cost and express cost, if more than 24 month, we also free to maintain the broken parts, but for send the new parts, the buyer need bear the express cost.

– 4.When ship the stud and track rolling machine, We will also send one set CD and specification(Chinese and English) to you with the machine,they can teach you how to operater the stud and track rolling machine

About us-TIANJIN HAIXING 

1. Warranty :Two years, and we will provide technical support for whole life of the equipment.
2. Delivery time: Within 25 days after deposit receipt your payment
3. Guarantee period: 24months free service/ pay service all the stud and track rolling machine life
4. Installation and training If buyers visit our factory and check the stud and track rolling machine, we will teach you how to install and use the stud and track rolling machine and also train your workers/technician face to face .
5. If you come our factory ,you can by air to Beijing airport, the by fast train to Cangzhou west station ,we can go there pick up you .
If you to Tianjin airport ,we can directly to Tianjin airport pick up you .

Previous page :

Related Products

Online Message